CPP were engaged by SMEC to investigate the detailed design cost estimate of a bridge replacement in remote Queensland. The bridge was unique in that all the bridge elements were precast, manufactured in Townsville and transported to site.

Project information

Project Owner
TMR
Client
SMEC
Stage
Detailed Design
Location
Burketown, Far North Queensland
Capital Cost
~$6M
Year
2018
Outcome
Delivered

Scope

Replacement of the existing single lane bridge with a two lane concrete bridge.

  • Side track construction to facilitate existing bridge removal and new bridge construction
  • Precast bridge elements supplied from Townsville to site and lifted into place by a crane. The largest precast element being the abutments weighing 46 tonne each.
  • Roadworks to bridge approaches
  • Cultural and environmental constraints

 

Service Provided

CPP were engaged by SMEC to provide a risk adjusted cost estimate at detailed design stage. The project is located in a remote part of Queensland 27km south of Burketown, in the Gulf of Carpentaria region and required careful consideration of the logistical challenges in developing the cost and construction methodology.

  • P50/90 cost estimate report
  • Construction program
  • Risk and opportunity

Tools used