Replacement of the existing single lane bridge with a two lane concrete bridge.
CPP were engaged by SMEC to provide a risk adjusted cost estimate at detailed design stage. The project is located in a remote part of Queensland 27km south of Burketown, in the Gulf of Carpentaria region and required careful consideration of the logistical challenges in developing the cost and construction methodology.